Project Highlight At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely conclusion of the project. Designed to strengthen ESG targets, the installation improves system dependability while lowering overall energy usage and CO₂ levels. https://socialicus.com/story6197772/advanced-400-kw-chiller-installation-delivers-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut