Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, supplying a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production criteria. The scope included the end-to-end implementation of advanced HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. Based on https://captainbookmark.com/story20591400/penmann-ltd-finalises-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme